We are health and safety consultants specialists in construction and design risk management.

OUR COLLECTIVE CDM EXPERIENCE

Neuron Pod - Crossrail - Olympic Park Enabling - Heron Tower - A2 Motorway Widening - EE Telecoms - Olympic Park Overlay - Hilton Bournemouth - Farringdon West Overstation Development - Wimbledon N1 Court - Royal Vet College - Lower Thames Crossing - One Waterloo - Southern Water - Chatham Waterfront Media - Lambeth Nine Elms - Sky Studios - Layden House - KCC Great Hall -

OUR RECENT CDM ENGAGEMENTS

Projects 1 1

Patheon Lab

Scope: Conversion of the office into lab extension.

Commission: Technical CDM Advisor supporting the Principal Designer team and coaching project designers. CDM training (Bryden Wood_RIBA 4).

Project Challenge: Shared access within chemically operational environment.

Year: 2019

Principal Designer Mentoring Coaching Strategy

Principal Designer mentoring

Scope: Re-engineering of Principal Designer strategy for Bryden Wood Technologies.

Commission: Reframing of strategy, process, procedures, documentation, training, coaching and CDM for BIM Revit.

Project Challenge: implementation of ongoing projects and refocusing of design teams toward the new strategy.

Year: 2019-2020

Equinix Data Centre Principal Designer Advisor

Equinix Data Centre

Scope: New Development and link to an existing building.

Commission: Technical CDM Advisor supporting the Principal Designer team and coaching project designers. CDM training (Bryden Wood_RIBA 4-5).

Project Challenge: Working with a globally branded concept design and existing asset.

Year: 2019-2020

Landsec Summer Street Principal Designer Advisor

Summer Street / Landsec

Scope: New build for commercial purposes.

Commission: Technical CDM Advisor supporting the Principal Designer team and coaching project designers. CDM training (Bryden Wood_RIBA 3-5).

Project Challenge: Works coordination with adjacent operational buildings.

Year: 2019-2020

Sky Media Principal Designer Client Advisor

Sky Media

Scope: Refurbishment of studios and media premises.

Commission: Monitoring H&S/CDM Compliance of the Principal Designer and CDMA’s delivery, designers and contractor’s risk management process and overall project compliance with CDM2015 (Fulkers_RIBA 2-5).

Project Challenge: Working within operational broadcasting studios in West London.

Year: 2018-2019

ISG Retail Reactive Maintenance Principal Designer

ISG/Lloyds Bank

Scope: Re-engineering of Principal Designer strategy for ISG Retail Reactive Maintenance Scheme applied to the banking sector. 

Commission: Principal Designer implementation, advice, support and Compliance. Preparation of CDM management system for SSIP accreditation.

Project Challenge: Working within fast track reactive maintenance schemes in London and Kent.

Year: 2019

Over Station Development Farringdon Principal Designer Client Advisor

FARRINGDON WEST OSD

Scope: Commercial new build “Over Station” at Farringdon station.

Commission: H&S/CDM Compliance monitoring the Principal Designer and CDMA’s delivery, other CDM dutyholders risk management process and overall project compliance with CDM2015 (Fulkers_RIBA 3 & 4).

Project Challenge: new build above operational tube station in central London.

Year: 2018

Royal Veterinary College Principal Designer Client Advisor

ROYAL VETERINARY COLLEGE

ScopeExtension of labs and academic premises within the campus. 

Commission: CDMA and Principal Designer compliance monitoring, including competence assessments and project H&S compliance (Fulkers_RIBA 2 & 3)

Project Challenge: Design risk management of research premises involved with biological agents and teaching season.

Year: 2018-2019

Lower Thames Crossing LTC CDM Manager

LOWER THAMES CROSSING

Scope: Civil engineering and infrastructure -major highways project- involving an under-river tunnel and across-river bridge for Highways England.

Commission: CDM Implementation & Compliance Management. The key duties involved developing the CDM strategy for implementation and assurance (CH2M/Jacobs_RIBA 2).

Project Challenge: Design risk management of concept design for later tunnelling underwater and operational motorway infrastructure within Kent, London and Essex.

Year: 2017-2018

Projects 2 11

ONE WATERLOO

Scope: Demolition and new build adjacent to Waterloo Station. 

Commission: H&S/CDM Compliance monitoring the CDM Client Advisor and assisting the client with Client Brief, collection of existing H&S File information, competence assessment and other client duties (Fulkers_RIBA 2).

Project Challenge: Demolition and new build adjacent to the operational railway station and close to underground operational lines in central London.

Year: 2018