Strategy and Risk Management Consultants​

WE ARE A YOUNG ENTERPRISE ON THE RISE !

OUR COLLECTIVE EXPERIENCE

Neuron Pod - Crossrail - Olympic Park Enabling - Heron Tower - A2 Motorway Widening - EE Telecoms - Olympic Park Overlay - Hilton Bournemouth - Farringdon West Overstation Development - Wimbledon N1 Court - Royal Vet College - Lower Thames Crossing - One Waterloo - Southern Water - Chatham Waterfront Media - Lambeth Nine Elms - Sky Studios - Layden House - KCC Great Hall -

OUR LATEST ENGAGEMENTS

Courtesy: Image by Darko Stojanovic from Pixabay

Patheon Lab

Scope: Conversion of the office into lab extension.
Commission: Technical CDM Advisor supporting the Principal Designer team and coaching project designers. CDM training (Bryden Wood_RIBA 4).
Project Challenge: Shared access within chemically operational environment.
Year: 2019-2020

Courtesy: Image by Diggity Marketing from Pixabay

Principal Designer Mentoring

Scope: Re-engineering of Principal Designer strategy for Bryden Wood Technologies.
Commission: Reframing of strategy, process, procedures, documentation, training, coaching and CDM for BIM Revit.
Project Challenge: implementation of ongoing projects and refocusing of design teams toward the new strategy.
Year: 2019-2020
Courtesy: Image by Elchinator from Pixabay

Equinix Data Centre

Scope: New Development and link to an existing building.
Commission: Technical CDM Advisor supporting the Principal Designer team and coaching project designers. CDM training (Bryden Wood_RIBA 4-5).
Project Challenge: Working with a globally branded concept design and existing asset.
Year: 2019-2020

Courtesy: Image by Malachi Witt from Pixabay

Summer Street

Scope: New build for LandSec commercial purposes.
Commission: Technical CDM Advisor supporting the Principal Designer team and coaching project designers. CDM training (Bryden Wood_RIBA 3-5).
Project Challenge: Works coordination with adjacent operational buildings.
Year: 2019-2020

Sky Studios Refurbishment
Courtesy: Image by Bokskapet from Pixabay

Sky Media

Scope: Refurbishment of studios and media premises.
Commission: Monitoring H&S/CDM Compliance of the Principal Designer and CDMA’s delivery, designers and contractor’s risk management process and overall project compliance with CDM2015 (Fulkers_RIBA 2-5).
Project Challenge: Working within operational broadcasting studios in West London.
Year: 2018-2019

Courtesy: Image by fran1 from Pixabay

ISG / Lloyds Bank

Scope: Re-engineering of Principal Designer strategy for ISG Retail Reactive Maintenance Scheme applied to the banking sector.
Commission: Principal Designer implementation, advice, support and Compliance. Preparation of CDM management system for SSIP accreditation.
Project Challenge: Working within fast track reactive maintenance schemes in London and Kent.
Year: 2019

Courtesy: mage by Anja from Pixabay

Farringdon West OSD

Scope: Commercial new build “Over Station” at Farringdon station.
Commission: H&S/CDM Compliance monitoring the Principal Designer and CDMA’s delivery, other CDM dutyholders risk management process and overall project compliance with CDM2015 (Fulkers_RIBA 3 & 4).
Project Challenge: new build above operational tube station in central London.
Year: 2018

Courtesy: Image by David Mark from Pixabay

Royal Veterinary College

Scope: Extension of labs and academic premises within the campus. 
Commission: CDMA and Principal Designer compliance monitoring, including competence assessments and project H&S compliance (Fulkers_RIBA 2 & 3)
Project Challenge: Design risk management of research premises involved with biological agents and teaching season.
Year: 2018-2019

Courtesy: Image by jodeng from Pixabay

Lower Thames Crossing

Scope: Civil engineering and infrastructure -major highways project- involving an under-river tunnel and across-river bridge for Highways England.
Commission: CDM Implementation & Compliance Management. The key duties involved developing the CDM strategy for implementation and assurance (CH2M/Jacobs_RIBA 2).
Project Challenge: Design risk management of concept design for later tunnelling underwater and operational motorway infrastructure within Kent, London and Essex.
Year: 2017-2018 

Courtesy: Image by Steve Buissinne from Pixabay

One Waterloo

Scope: Demolition and new build adjacent to Waterloo Station.
Commission: H&S/CDM Compliance monitoring the CDM Client Advisor and assisting the client with Client Brief, collection of existing H&S File information, competence assessment and other client duties (Fulkers_RIBA 2).
Project Challenge: Demolition and new build adjacent to the operational railway station and close to underground functional lines in central London.
Year: 2018

WE ARE A YOUNG ENTERPRISE ON THE RISE !